Please check an answer for every question.
We use cookies to personalise content, to provide social media features and to analyse our traffic. We also share information about your use on our site with our socal media and analytics partners who may combine it with other information that you've provided to them or that they've collected from your use of their services.
Enabling this category of cookie would establish statistics of attendance on the site. Disabling them prevents us from tracking and improving the quality of our services.
Enabling this category of cookie would establish statistics of attendance on the site. Disabling them prevents us from tracking and improving the quality of our services.
Enabling this category of cookie would establish statistics of attendance on the site. Disabling them prevents us from tracking and improving the quality of our services.
Enabling this category of cookie would establish statistics of attendance on the site. Disabling them prevents us from tracking and improving the quality of our services.
Enabling this category of cookie would establish statistics of attendance on the site. Disabling them prevents us from tracking and improving the quality of our services.
Enabling this category of cookie would establish statistics of attendance on the site. Disabling them prevents us from tracking and improving the quality of our services.
Enabling this category of cookie would establish statistics of attendance on the site. Disabling them prevents us from tracking and improving the quality of our services.
Enabling this category of cookie would establish statistics of attendance on the site. Disabling them prevents us from tracking and improving the quality of our services.

Total E&P UK Upstream Operational Information

As required under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT), this page provides information on the planned maintenance and unplanned unavailability of infrastructure operated by Total E&P UK Limited.

Whilst every effort is made to ensure that the information is given in good faith and to the best of our knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of that information.

Notification of Planned Unavailability

 

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Teesside - CATS 1 13/11/2019  14:11:02 08/11/2019 ~8 days 11 Culzean export not expected to restart until the 14th November, export will be approximately 50% of technical capacity with rates ramping up to technical capacity on the 15th November.
Teesside - CATS 0 04/11/2019  16:30 08/11/2019 6 days 11 Planned maintenance on Culzean. Five day shutdown, ramp up/down either side of maintenance.
Bacton SEAL 1 10/08/2019  08:49 08/08/2019 ~4 days 3.75 Restrictions on oil export route not expected to be lifted until Sunday then ramp up to previous rates.
Bacton SEAL 0 07/08/2019  20:00 08/08/2019 1 day 3.75 Due to restrictions from a third-party on the oil export route, gas export from Elgin-Franklin will be restricted.
08-Aug-19 - production restricted to ~50% 09-Aug-19 - production restricted to ~40% with potential to be a total export restriction.
Bacton SEAL 2 04/08/2019  15:54 01/08/2019 ~4 days 10 Gas export on Elgin Franklin has restarted. Flows from Bacton SEAL will commence from 20:00hrs onwards. Ramp up to full production rates may take up to 24-48 hours.
Bacton SEAL 1 29/07/2019  00:00 01/08/2019   10 Update on previous message, due to rig moves export levels are at approximate 50% and will continue around this rate until the shutdown
Bacton SEAL 0 16/07/2019  20:09 01/08/2019 2 days 10 Ramp up to normal rates will take approximately 48 hours.
Bacton SEAL 1 04/06/2019  21:06:00 01/06/2019 ~4 days 10 UPDATE: Offshore production for Elgin Franklin has restarted. Flows from Bacton SEAL will commence from 22:00hrs onwards. Elgin Franklin will take around 18-24 hours to ramp back up to normal rates.
Bacton SEAL 0 30/04/2019  08:01 01/06/2019 6 days 1 Oil export route unavailable. Restart date / time subject to change. Elgin Franklin will take around 36 hours to ramp back up to previous rates.
NSMP -SF 1 31/05/2019  13:31 29/05/2019 ~3 days 8.5 Update: Production at Laggan Tormore has restarted. Normal rates are expected for gas day 01-Jun-2019.
NSMP -SF 0 18/05/2019  12:42 29/05/2019 4 days 8.5 Planned shutdown of Laggan Tormore. Ramp down on the 28th with zero export planned for the 29th - 31st May (inclusive) with a ramp up on the 1st June. Export rates for the 28th May and 1st June expected to be around 50%.
NSMP -SF 0 19/02/2019  16:29 28/02/2019 4 days 3.5 Alwyn maintenance. Ramp up expected on the 7th.
             

 

Notification of Unplanned Unavailability

 

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Teesside - CATS 3 07/12/2019  07:39:33 07/12/2019 ~3days 2.3 Culzean production returning to normal levels throughout the gas-day.
Teesside - CATS 2 06/12/2019  12:10:20 06/12/2019 ~3days 6.2 Culzean did restart overnight but production has yet to ramp up to normal levels.
Teesside - CATS 1 05/12/2019  10:48:20 05/12/2019 ~2days 8.7 Culzean is expected to restart late tonight.
Teesside - CATS 0 04/12/2019  21:50:19 04/12/19 1 day 5.5 Culzean has tripped. Flows at CATS will start to drop. Investigations ongoing. Restart is currently unknown.
Bacton SEAL 4 07/12/2019  22:14:09 07/12/2019 ~7 days 0 Elgin Franklin gas export has restarted. Flows at Bacton SEAL will commence from 23:00hrs onwards.
Bacton SEAL 3 05/12/2019  16:16:55 05/12/2019 ~7 days 12 Estimated restart is now gas-day 7th December.
Bacton SEAL 2 02/12/2019  14:58:12 02/12/2019 ~6 days 12 Elgin Franklin remains shutdown. Estimated restart is now gas-day 6th December.
Bacton SEAL 1 01/12/2019  21:35:30 01/12/2019 ~3 days 12 Elgin Franklin is still shutdown. Restart of gas export is not forecast for a minimum of 48 hours. Updates will be provided as they become available.
Bacton SEAL 0 01/12/2019  07:01:37 01/12/2019 1 day 12 Elgin Franklin has tripped. Flows at Bacton SEAL will begin to drop.
Teesside - CATS 1 21/11/2019  20:42:01 21/11/2019 ~1day 5 Culzean ramp up to normal rates underway.
Teesside - CATS 0 21/11/2019  16:53:18 21/11/19 1 day 6 Production rates have been reduced on Culzean, full rates expected for gas day 22-Nov-2019.
Teesside CATS 2 31/10/2019  19:52:45 31/10/2019 ~3 days 10.4 Culzean gas export is currently ramping up. Full production levels expected for midday gas-day 1st November.
Teesside CATS 1 30/10/2019  16:20:13 30/10/2019 ~2 days 11.7 Culzean gas export is reduced to ~10% due to issues offshore. Flows not expected to ramp up again until the afternoon of gas-day 31st October.
Teesside CATS 0 29/10/2019  22:47:56 29/10/2019 1 day 11.7 Culzean gas export is reduced to ~10% due to issues offshore. Flows will continue to ramp down over the next 24-hours.
Bacton SEAL 2 26/10/2019  10:11:25 25/10/2019 ~2 days 11 Elgin Franklin gas export restarted overnight.
Flows at Bacton SEAL will commence from 10:00hrs onwards and ramp up throughout the gas-day.
Bacton SEAL 1 25/10/2019  13:13:18 25/10/2019 ~2 days 11 Elgin Franklin gas export is still offline.
Restart is forecast for 17:00hrs today at the earliest.
Bacton SEAL 0 24/10/2019  15:58:30 24/10/2019 1 day 11 Elgin Franklin gas export has stopped due to a restriction on the oil export route. Restart time is unknown.
Elgin Franklin delivery at SEAL is coming from stock at the moment, it's forecast that Elgin Franklin delivery at SEAL will go to zero at 2200.
Teesside CATS 3 24/10/2019  05:20:03 24/10/2019 ~2 days 2.8 Culzean has restarted following trip earlier and is ramping up export rates.
Teesside CATS 2 23/10/2019  21:35:42 23/10/2019 ~1 day 6.4 Culzean has restarted following trip earlier and is ramping up export rates.
Teesside CATS 1 23/10/2019  18:49:35 23/10/2019 1 day 3.6 Culzean trip. Correction.
Teesside CATS 0 23/10/2019  18:47:27 23/10/2019 1 day 7.5 Culzean trip.
Teesside CATS 1 20/10/2019  13:53 20/10/2019 ~1 day 1.9 Culzean field has restarted this morning and is slowly increasing export rates.
Teesside CATS 0 20/10/2019  05:45 20/10/2019 1 day 1.9 Culzean field has tripped . Restart time unknown, likely that unavailable capacity will increase.
Bacton SEAL 3 20/10/2019  13:49 20/10/2019 ~2 days 2 Elgin Franklin gas export rates into SEAL are now back to normal.
Bacton SEAL 2 20/10/2019  05:30 20/10/2019 ~2 days 9 Elgin Franklin gas export has restarted and is ramping up.
Delivery at SEAL for Elgin Franklin are forecast to start around 0500 at around 2 MCM/M by midday up to around 5 MCM/D, by 1800 at 9 MCM/D and should be close to normal by the start of gas day 21 October 2019.
Bacton SEAL 1 19/10/2019  10:53 19/10/2019 ~2 days 11 Elgin Franklin gas export has stopped due to a restriction on the oil export route. It's not known when the oil route will be available.
Bacton SEAL 0 18/10/2019  07:30 18/10/2019 1 day 11 Elgin Franklin gas export has stopped due to a restriction on the oil export route. Restart is unknown.
Teesside CATS 4 14/10/2019  08:35:00 14/10/2019 ~2 days 3.6 Culzean ramp up continuing.
Teesside CATS 3 14/10/2019  07:20:00 14/10/2019 ~2 days 4.7 Culzean ramp up continuing.
Teesside CATS 2 13/10/2019  12:39:00 13/10/2019 ~1 days 6.3 Culzean tripped, ramp up underway.
Teesside CATS 1 13/10/2019  08:21:00 13/10/2019 ~1 days 5 Culzean did restart following trip, further ramp up on hold at the moment.
Teesside CATS 0 13/10/2019  05:18:00 13/10/2019 1 days 2.9 Reduced rate following Culzean trip. Export rates increasing, should be back to previous levels by gas day 14.
Bacton SEAL 0 08/10/2019  08:42 08/10/2019 1 day 5 Elgin Franklin tripped overnight, flows at Bacton SEAL at half rates. Production restarted offshore, ramp up will commence over the rest of the gas day.
Teesside CATS 2 04/10/2019  10:37 04/10/2019   3.6 Culzean has restarted overnight and is ramping up.
Teesside CATS 1 03/10/2019  20:16 03/10/2019   8.8  
Teesside CATS 0 03/10/2019  12:54 03/10/2019   4 Culzean trip.
Teesside CATS 4 25/09/2019  17:19 25/09/2019 ~2 day 2.8 Culzean almost back to normal levels.
Teesside CATS 3 25/09/2019  05:58 25/09/2019 ~2 day 5.6 Culzean is exporting above nomination, stock levels need to be increased before a nomination increase.
Teesside CATS 2 24/09/2019  22:43 24/09/2019 ~1 day 5.3 Culzean has restarted, ramp up ongoing.
Teesside CATS 1 24/09/2019  16:50 24/09/2019 ~1 day 8.1 Restart delayed, full export levels not expected until gas day 25 September.
Teesside CATS 0 24/09/2019  16:49 24/09/2019 1 day 3.75 Culzean trip.
Teesside CATS 2 24/09/2019  09:00 24/09/2019 ~2 days 0.5 Culzean restarted overnight. Export levels back to normal.
Teesside CATS 1 24/09/2019  05:57 24/09/2019 ~2 days 6 Culzean restarted overnight. Stock levels being increased. CATS delivery for Culzean expected to be close to normal for gas day 25-Sep-19.
Teesside CATS 0 23/09/2019  09:04 23/09/2019 1 day 8.3 Culzean has tripped.
Teesside CATS 4 23/09/2019  05:12 23/09/2019 ~4 days 11.6 Culzean has restarted.
Teesside CATS 3 20/09/2019  21:25 20/09/2019 ~4 days 11.6 Culzean remains shutdown. Investigations ongoing, earliest restart is Sunday 22nd.
Teesside CATS 2 20/09/2019  07:51 20/09/2019 ~2 days 10.7 Culzean remains shutdown. Investigations ongoing, restart date unknown. Delivery coming from stock.
Teesside CATS 1 20/09/2019  05:05 20/09/2019 ~2 days 4.2 Culzean remains shutdown. Delivery at CATS coming from stock.
Teesside CATS 0 19/09/2019  19:57 19/09/2019 1 day 7.5 Culzean field shutdown. Investigations ongoing.
Teesside CATS 0 12/09/2019  16:24 12/09/2019 1 day 8.9 Culzean platform trip - restart expected tonight.
Teesside CATS 1 08/09/2019  08:28 08/09/2019 ~1 day 3.2 Culzean gas export restarted overnight.
Teesside CATS 0 07/09/2019  23:27 07/09/2019 1 day 7.2 Culzean gas export has tripped. Restart unknown.
Teesside CATS 10 25/08/2019  07:16 23/08/2019 ~7 days 0 Culzean ramp up complete.
Teesside CATS 9 25/08/2019  07:15 23/08/2019 ~7 days 8.5 Culzean ramp up complete.
Teesside CATS 8 24/08/2019  06:24 23/08/2019 ~6 days 5.1 Culzean ramp up taking longer than anticipated.
Teesside CATS 7 23/08/2019  05:57 23/08/2019 ~6 days 6 Culzean has restarted, ramp up of export rates ongoing.
Teesside CATS 6 21/08/2019  19:10 22/08/2019 ~4 days 11.1 Issues preventing gas export. Export to CATS unknown.
Teesside CATS 5 21/08/2019  08:06 21/08/2019 ~3 days 10.4 Issues preventing gas export. Export to CATS unknown.
Teesside CATS 4 21/08/2019  05:44 21/08/2019 ~3 days 8.2 Issues starting Culzean compressor preventing export. Gas delivered from 0600 coming from stock.
Teesside CATS 3 20/08/2019  15:13 20/08/2019 ~2 days 11.1 Culzean start up delayed until the evening.
Teesside CATS 2 20/08/2019  13:00 20/08/2019 ~2 days 8.9 Culzean has yet to restart following the trip yesterday. Culzean gas delivered at Teesside is coming from stock. It is planned to restart Culzean this afternoon.
Teesside CATS 1 20/08/2019  01:48 20/08/2019 ~2 days 6.2 Culzean trip.
Teesside CATS 0 19/08/2019  23:00 19/08/2019 1 days 6.1 Culzean trip, restart time unknown.
Teesside CATS 4 09/08/2019  08:21 09/08/2019 ~5 days 4.4 Rates expected to stay at current levels until Sunday.
Teesside CATS 3 08/08/2019  07:02 05/08/2019 ~4 days 4.3 Culzean export has restarted. Ramp up will commence over the rest of the gas-day.
Teesside CATS 2 07/08/2019  07:57 05/08/2019 ~3 days 5.6 Culzean export remains at zero.
Teesside CATS 1 06/08/2019  07:27 05/08/2019 ~2 days 5.6 Culzean export remains at zero. Start up process underway.
Teesside CATS 0 05/08/2019  07:34 05/08/2019 1 day 5.6 Culzean export to CATS has stopped. Gas being delivered at CATS currently coming from linestock.
Teesside CATS 3 04/08/2019  15:40 03/08/2019 ~2 days 5.6 Culzean export has restarted, flows will increase from 16:00hrs onwards.
Teesside CATS 2 04/08/2019  06:29 03/08/2019 ~2 days 8.1 Culzean export has tripped overnight, flows will drop from 06:00hrs onwards. Restart is unknown.
Teesside CATS 1 03/08/2019  18:21 03/08/2019 ~1 day 9.8 Culzean export restarted, flows will ramp up from 18:00hrs onwards.
Teesside CATS 0 03/08/2019  03:52 03/08/2019 1 day 9.8 Culzean tripped on ramp up - restart time unknown.  Rates assumed Culzean had ramped up to full rates.
Teesside CATS 4 02/08/2019  16:16 02/08/2019 ~2 day 8.2 Culzean export has restarted and ramp up under way.
Teesside CATS 3 02/08/2019  07:41 02/08/2019 ~2 day 8.2 Culzean export still offline. Restart process underway. Gas being delivered at CATS coming from stock.
Teesside CATS 2 01/08/2019  23:53 01/08/2019 ~1 day 8.8 Further nomination down from 2000 - flowrates below are effective from 2000.
Teesside CATS 1 01/08/2019  08:56 01/08/2019 ~1 day 7.6 Further nomination down from 0900 - flowrates below are effective from 0900.
Teesside CATS 0 01/08/2019  07:15 01/08/2019 1 day 4.7 Culzean export stopped overnight. Restart time unknown.
Teesside CATS 1 23/07/2019  05:53 22/07/2019 ~1 day 5 Production restarted overnight.
Teesside CATS 0 22/07/2019  21:28 22/07/2019 1 day 5 Production stop at Culzean. Too early to have a restart date.
Teesside CATS 0 20/07/2019  12:26 20/07/2019 1 day 4 Culzean tripped last night investigation complete restart underway.
Bacton SEAL 4 11/07/2019  21:36 08/07/2019 ~5 days 7 The issue on the oil export route has been resolved and the restrictions has been lifted. Elgin Franklin will ramp up with normal production expected by the end of gas-day 12th July.
Bacton SEAL 3 11/07/2019  08:36 08/07/2019 ~4 days 7 Restriction expected to remain in place until Friday, with ramp up to normal export rates after that.
Bacton SEAL 2 08/07/2019  16:27 08/07/2019 ~2 days 7 Gas export from Elgin Franklin has restarted. It continues to be restricted to 3 MCM/D due to an issue on the oil export route.
Bacton SEAL 1 08/07/2019  10:58 08/07/2019 ~2 days 10 Gas export from Elgin Franklin has stopped due to a trip. Once export is restarted it will be restricted to 3 MCM/D due to an issue on the oil export route.
Bacton SEAL 0 07/07/2019  17:29 07/07/2019 3 days 7 Gas export on Elgin Franklin is restricted to current levels due to an issue on the oil export route. Current forecast for resumption of normal production is 3 days.
Bacton SEAL 0 22/06/2019  08:10 21/06/2019 2 days 10 Offshore production for Elgin Franklin has stopped. Gas export is currently forecast to restart by 11:00 hrs today. Flows are forecast to return to normal by gas-day 23rd June.
Bacton SEAL 1 18/06/2019  10:35 18/06/2019 ~1 day 7 Booster compressor trip on Elgin Franklin. Export expected to resume at midday, with normal delivery later in the day. Delay in restarting compressor.
Bacton SEAL 0 18/06/2019  07:24 18/06/2019 0.5 days 6 Booster compressor trip on Elgin Franklin. Export expected to resume in the next hours. Normal rates by midday. Impact on within day should be small due to the duration of the trip.
Bacton SEAL 1 13/05/2019  07:03 12/05/2019 ~1 day 11 Elgin Franklin exports restarted overnight. Flows at the SEAL terminal almost back to normal at the start of gas day 13th May.
Bacton SEAL 0 12/05/2019  22:04 12/05/2019 2 days 11 Flows at Bacton SEAL reducing for Elgin Franklin. Elgin Franklin gas export has stopped. Offshore restart is unknown, updates will be supplied when available.
Bacton SEAL 4 18/02/2019  22:54 17/02/2019 ~3 day 3.5 Elgin Franklin issues resolved and export rates increasing. Normal export rates expected for gas day 19-Feb-2019.
Bacton SEAL 3 18/02/2019  20:17 17/02/2019 ~2 day 3.5 Export levels from Elgin Franklin to remain around the current level for approximately another 12 hours due to a problem with coolers.
Bacton SEAL 2 18/02/2019  07:19 17/02/2019 ~2 day 10 Gas export from Elgin Franklin is forecast to restart from 10am on the 18th. Ramp up will be slow with normal offshore rates not expected until almost the end of the gas day.
Bacton SEAL 1 18/02/2019  05:06 17/02/2019 ~2 day 10 Issues with power generation have delayed restart. Restart time currently unknown but not expected until the evening of the 18th.
Bacton SEAL 0 17/02/2019  17:33:00 17/02/2019 1 day 10 Gas export has stopped from Elgin Franklin.
Bacton SEAL 2 25/01/2019  07:43:00 23/01/2019 ~2 days 11 Elgin Franklin gas export has restarted. Gas Delivery at Bacton SEAL for Elgin Franklin is forecast to slowly start to increase from around 0900 this morning.
By midday Elgin Franklin delivery at SEAL is forecast to be around 5 MCM/D with rates continuing to ramp up to normal levels by the end of the gas day.
Bacton SEAL 1 24/01/2019  08:44:00 23/01/2019 ~1 day 11 Elgin Franklin restart process is underway. Gas export from Elgin Franklin is not expected until late tonight.
Gas Delivery at Bacton SEAL for Elgin Franklin is not expected until very late on Gas Day 24th January or more likely early Gas Day 25th January.
Bacton SEAL 0 23/01/2019  04:56:00 23/01/2019 1 day 11 Due to an issue with a compressor, Elgin Franklin gas export is expected to be offline for approximately 24 hours.
Stock at SEAL is slowly reducing at the moment with delivery of Elgin Franklin gas at SEAL forecast to stop at midday 23-Jan-2019.
Bacton SEAL 4 20/01/2019  08:42 19/01/2019 ~2 days 6 Elgin Franklin export levels ramping up.
Bacton SEAL 3 19/01/2019  21:20:00 19/01/2019 ~1 day 11 Flows for Elgin Franklin at the SEAL terminal have stopped. Flows at SEAL are not forecast to start until 0200 on the 20th January with a slow ramp up to normal levels.
Bacton SEAL 2 19/01/2019  15:37:00 19/01/2019 ~1 day 11 Elgin Franklin gas export has stopped. Flows for Elgin Franklin at the SEAL terminal have stopped. Flows at SEAL are not forecast to start until midnight tonight with a slow ramp up to normal levels.
Bacton SEAL 1 19/01/2019  07:26:00 19/01/2019 2 days 11 Elgin Franklin gas export has stopped. Issues with a booster compressor are delaying restart. Gas export from Elgin Franklin is not not expected until this afternoon followed by a ramp up to normal rates.
Bacton SEAL 0 19/01/2019  00:31:00 19/01/2019 1 day 5 Elgin Franklin gas export has stopped. Platform has been reset and restart underway (Event End estimated) Offshore export not expected for a few hours yet.
Flows at Bacton SEAL starting to reduce for Elgin Franklin. Flow loss estimated at 5 MCM/D by 0400.
             

 

Historic Information

 

2018 Upstream operational information

 

2017 Upstream operational information

 

2016 Upstream operational information

 

2015 Upstream operational information