Skip to content
Please check an answer for every question.
Cookie settings

Total may deposit the following categories of cookies: Cookies for statistics, targeted advertising and social networks. You have the possibility to disable these cookies, these settings will only be valid on the browser you are currently using.

Enabling this cookie category allows you to establish statistics of traffic on the site. Disabling them prevents us from monitoring and improving the quality of our services.
Our website may contain sharing buttons to social networks that allow you to share our content on these social networks. When you use these sharing buttons, a link is made to the servers of these social networks and a third-party cookie is installed after obtaining your consent.
Enabling this cookie category would allow our partners to display more relevant ads based on your browsing and customer profile. This choice has no impact on the volume of advertising.

Total E&P UK Upstream Operational Information

As required under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT), this page provides information on the planned maintenance and unplanned unavailability of infrastructure operated by Total E&P UK Limited.

Whilst every effort is made to ensure that the information is given in good faith and to the best of our knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of that information.

Notification of Planned Unavailability

 

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Teesside - CATS 5 22/01/2020  05:15:16 22/01/20 ~3 days 3.2 Culzean ramp up continuing.
Teesside - CATS 4 21/01/2020  14:07:17 21/01/20 ~3 days 10.1 Culzean has restarted. A slow ramp up will commence over the next 24 hours.
Teesside - CATS 3 20/01/2020  10:21:15 20/01/20 ~3 days 10.1 Culzean 3-day shutdown to carry out planned maintenance. A slow ramp up following the planned works. Revision to the available capacity coming from stock.
Teesside - CATS 2 19/01/2020  19:21:37 19/01/20 ~3 days 10.6 Culzean 3-day shutdown to carry out planned maintenance. A slow ramp up following the planned works. Revision to the available capacity coming from stock.
Teesside - CATS 1 18/01/2020  21:51:08 18/01/20 ~3 days 10.1 Culzean 3-day shutdown to carry out planned maintenance. A slow ramp up following the planned works. Available capacity coming from stock.
Teesside - CATS 0 17/01/2020  13:05:57 17/01/20 3 days 11.5 Culzean 3-day shutdown to carry out planned maintenance. A slow ramp up following the planned works.
             

 

Notification of Unplanned Unavailability

 

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Teesside - CATS 4 07/03/2020  17:52:33 07/03/2020 3 day 7.4 Culzean production returning to normal levels by gas-day 8th March.
Teesside - CATS 3 07/03/2020  10:31:29 07/03/2020 3 day 7.4 Culzean production reduced offshore.
Teesside - CATS 2 07/03/2020  07:15:00 07/03/2020 3 day 8.7 Culzean production reduced offshore.
Teesside - CATS 1 06/03/2020  13:51:24 06/03/2020 3 day 11.5 Culzean production reduced offshore.
Teesside - CATS 0 04/03/2020  14:07:14 04/03/2020 ~2 day 11 Culzean production reduced offshore.
Bacton SEAL 3 26/02/2020  09:40:12 26/02/2020 1 day 3.5 Laggan Tormore has restarted and is ramping up, stock being rebuilt.
Bacton SEAL 2 26/02/2020  05:06:40 26/02/2020 1 day 6 Laggan Tormore has restarted and is ramping up, stock being rebuilt.
Bacton SEAL 1 25/02/2020  15:48:13 25/02/2020 1 day 5.3 Laggon Tormore shut down. Delay in restart.
Bacton SEAL 0 25/02/2020  11:25:05 25/02/2020 ~1 day 4.4 Laggon Tormore shut down.
Teesside - CATS 4 26/02/2020  09:40:12 26/02/2020 2 day 3.7 Culzean export rates almost back to normal.
Teesside - CATS 3 26/02/2020  05:06:40 26/02/2020 2 day 6.9 Culzean export rates almost back to normal. Line stock needs to be rebuilt.
Teesside - CATS 2 26/02/2020  08:00:06 26/02/2020 2 day 8.5 Culzean production reduced offshore.
Teesside - CATS 1 25/02/2020  16:57:10 25/02/2020 1 day 10.2 Culzean production reduced offshore.
Teesside - CATS 0 25/02/2020  11:19:03 25/02/2020 ~1 day 7.4 Culzean production reduced offshore.
Teesside - CATS 3 21/02/2020  05:08:18 21/02/2020 1 day 0.9 Culzean rebuilding stock account. Offshore rates back to normal.
Teesside - CATS 2 20/02/2020  21:00:48 20/02/2020 1 day 2.8 Culzean rebuilding stock account.
Teesside - CATS 1 20/02/2020  09:25:42 20/02/2020 1 day 7.6 Culzean trip overnight, Culzean has yet to restart.
Teesside - CATS 0 20/02/2020  05:20:37 20/02/2020 ~1 day 4.6 Culzean trip overnight, forecast to restart production during gas day 20-Feb-2020.
Bacton SEAL 1 03/02/2020  07:27:35 03/02/2020 ~1 day 0 Elgin Franklin gas export has restarted overnight. Flows at Bacton SEAL will commence from 08:00hrs onwards and ramp up over the rest of the gas-day.
Bacton SEAL 0 02/02/2020  16:46:13 02/02/2020 1 day 12 Elgin Franklin has tripped. Restart is currently unknown. Flows at Bacton SEAL will start to drop from 17:00hrs onwards.
Teesside - CATS 1 23/01/2020  10:20:48 23/01/20 ~4 days 3.4 Culzean to be exporting at reduced rates until the 27th.
Teesside - CATS 0 22/01/2020  13:17:03 22/01/20 4 days 4.6 Culzean to be exporting at reduced rates until the 27th.
Teesside - CATS 0 17/01/2020  14:03:35 17/01/20 2 days 10.1 Culzean is on reduced export rates until Sunday 19th January.
Teesside - CATS 3 17/01/2020  14:00:13 17/01/20 ~3 days 8.7 Culzean is on reduced export rates until Sunday 19th January.
Teesside - CATS 2 17/01/2020  10:20:59 17/01/20 ~3 days 7.4 Culzean is on reduced export rates until Sunday 19th January.
Teesside - CATS 1 16/01/2020  16:27:15 16/01/20 ~1 days 7.1 Culzean is on reduced export rates, investigations ongoing.Flows at CATS may reduce further later.
Teesside - CATS 0 16/01/2020  12:10:39 16/01/20 1 days 4.6 Culzean is on reduced export rates, investigations ongoing.
Teesside - CATS 4 12/01/2020  10:13:51 12/01/20 ~3 days 4 Flows at CATS returning to normal levels throughout the gas-day.
Teesside - CATS 3 11/01/2020  16:29:47 11/01/20 ~3 days 11.5 Culzean ramp-up is ongoing. Flows at CATS have commenced.
Teesside - CATS 2 11/01/2020  11:13:29 11/01/20 ~3 days 9.9 Culzean restart is under way followed by a slow ramp up over the rest of the gas-day. Flows at CATS may not commence until gas-day 12th January.
Teesside - CATS 1 10/01/2020  10:55:24 10/01/20 ~2 days 9.9 Culzean is still shutdown. Restart is unknown at this time. Nomination at CATS is currently being supplied from pipeline stock.
Teesside - CATS 0 09/01/2020  19:53:51 09/01/20 1 day 9.9 Culzean has tripped. Flows at CATS will continue to drop throughout the rest of the gas-day. Restart is not forecast until gas-day 10th January.
             

 

Historic Information

 

2019 Upstream operation information

 

2018 Upstream operational information

 

2017 Upstream operational information

 

2016 Upstream operational information

 

2015 Upstream operational information