Skip to content
Please check an answer for every question.
Cookie settings

Total may deposit the following categories of cookies: Cookies for statistics, targeted advertising and social networks. You have the possibility to disable these cookies, these settings will only be valid on the browser you are currently using.

Enabling this cookie category allows you to establish statistics of traffic on the site. Disabling them prevents us from monitoring and improving the quality of our services.
Our website may contain sharing buttons to social networks that allow you to share our content on these social networks. When you use these sharing buttons, a link is made to the servers of these social networks and a third-party cookie is installed after obtaining your consent.
Enabling this cookie category would allow our partners to display more relevant ads based on your browsing and customer profile. This choice has no impact on the volume of advertising.

Total E&P UK Upstream Operational Information

As required under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT), this page provides information on the planned maintenance and unplanned unavailability of infrastructure operated by Total E&P UK Limited.

Whilst every effort is made to ensure that the information is given in good faith and to the best of our knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of that information.

Notification of Planned Unavailability

 

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Bacton - SEAL 6 06/09/2020  20:19:50 06/09/20 1 days 7.5 Elgin Franklin rates continue to slowly increase. SEAL flows forecast to start from 2100 at around 3.5 MCM/D by midnight rates should be around 7.0 MCM/D.
Bacton - SEAL 5 06/09/2020  11:37:08 06/09/20 1 days 11 Elgin Franklin restarted gas export this morning, current export rates are around 4 MCM/D. Delivery at the SEAL terminal for Elgin Franklin should be expected this afternoon. It will take between 12-24 hours for Elgin Franklin to ramp up to normal rates.
Bacton - SEAL 4 06/09/2020  06:06:52 06/09/20 1 days 11 Restart ongoing, due to ongoing issues gas export will is not expected to commence until later this morning, delivery at the SEAL terminal will be after that. A slow ramp up of export rates should be expected.
Bacton - SEAL 3 05/09/2020  20:31:19 05/09/20 1 days 11 Restart ongoing, due to ongoing issues gas export will is not expected to commence until midnight tonight, delivery at the SEAL terminal will be after that. A slow ramp up of export rates should be expected.
Bacton - SEAL 2 04/09/2020  20:31:19 04/09/20 2 days 11 Restart ongoing, gas export expected tomorrow afternoon with a slow ramp up of export rates.
Bacton - SEAL 1 03/09/2020  17:03:52 03/09/20 3 days 11 There is a delay in restart following the planned maintenance on Elgin Franklin.
Bacton - SEAL 0 06/07/2020  16:52:56 28/08/20 ~8 days 11 Shell as terminal operator have reported this shutdown. The rates reported here should not be added to the those reported by Shell. Planned shutdown of Elgin Franklin. There will be a ramp down prior to the shutdown. The shutdown is planned to take Seven days then a ramp up to normal rates.
NSMP - SF 1 01/09/2020  09:51:22 01/09/20 ~1 days 3 Planned maintenance. Delay in restart.
NSMP - SF 0 06/07/2020  16:16:24 27/08/20 ~5 days 3 Planned maintenance.
Bacton - SEAL 0 27/08/2020  16:31:09 27/08/20 ~1 days 0 Elgin Franklin has stopped exporting earlier than planned. Flows at Bacton SEAL have stopped for Elgin Franklin. Forecast restart date is 4th September.
Teesside - CATS 6 26/08/2020  07:35:39 26/08/20 1 days 3.2 Culzean stock levels being rebuilt.
Teesside - CATS 5 26/08/2020  06:00:16 26/08/20 1 days 9.2 Culzean has restarted, stock levels being rebuilt.
Teesside - CATS 4 25/08/2020  21:53:06 25/08/20 1 days 9.2 Delay in restarting production from Culzean. Restart not expected until this afternoon.
Teesside - CATS 3 24/08/2020  21:53:06 24/08/20 1 days 6.5 Delay in restarting production from Culzean.
Teesside - CATS 2 24/08/2020  20:33:54 24/08/20 1 days 6 Delay in restarting production from Culzean.
Teesside - CATS 1 24/08/2020  12:18:02 24/08/20 1 days 4.7 Reduced production from Culzean due to ESD test.
Teesside - CATS 0 24/08/2020  06:08:19 24/08/20 ~1 days 2.8 Reduced production from Culzean due to ESD test.
Bacton - SEAL 0 06/07/2020  16:52:56 28/08/20 ~7 days 11 Planned shutdown of Elgin Franklin. There will be a ramp down prior to the shutdown. The shutdown is planned to take Seven days then a ramp up to normal rates.
NSMP - SF 0 06/07/2020  16:16:24 28/08/20 ~6 days 3 Planned maintenance.
NSMP - SF 0 14/05/2020  07:50:45 20/05/20 ~3 days 7.6 Ramp down to start on gas day 20-May-2020, with zero export on gas day 21-May-2020, ramp up on gas day 22-May-2020.
Teesside - CATS 5 22/01/2020  05:15:16 22/01/20 ~3 days 3.2 Culzean ramp up continuing.
Teesside - CATS 4 21/01/2020  14:07:17 21/01/20 ~3 days 10.1 Culzean has restarted. A slow ramp up will commence over the next 24 hours.
Teesside - CATS 3 20/01/2020  10:21:15 20/01/20 ~3 days 10.1 Culzean 3-day shutdown to carry out planned maintenance. A slow ramp up following the planned works. Revision to the available capacity coming from stock.
Teesside - CATS 2 19/01/2020  19:21:37 19/01/20 ~3 days 10.6 Culzean 3-day shutdown to carry out planned maintenance. A slow ramp up following the planned works. Revision to the available capacity coming from stock.
Teesside - CATS 1 18/01/2020  21:51:08 18/01/20 ~3 days 10.1 Culzean 3-day shutdown to carry out planned maintenance. A slow ramp up following the planned works. Available capacity coming from stock.
Teesside - CATS 0 17/01/2020  13:05:57 17/01/20 3 days 11.5 Culzean 3-day shutdown to carry out planned maintenance. A slow ramp up following the planned works.
             

 

Notification of Unplanned Unavailability

 

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Teesside - CATS 2 04/10/2020  13:18:15 05/10/2020 1 day 1.6 Culzean ramping up to normal levels.
Teesside - CATS 1 04/10/2020  07:34:04 05/10/2020 1 day 7.4 Further reduction in production levels from Culzean.
Teesside - CATS 0 04/10/2020  07:22:08 04/10/2020 ~1 day 3.4 Reduction in production levels from Culzean. Unavailable capacity may increase later.
Bacton - SEAL 8 08/09/2020  05:14:05 08/09/2020 1 day 3 Elgin Franklin restrictions on oil export route lifted at 0330, export levels into SEAL back to normal. Stock levels increasing and delivery at SEAL will increase and return to normal levels over the course of gas day 8.
Bacton - SEAL 7 07/09/2020  06:19:30 07/09/2020 ~1 day 4.5 Elgin Franklin ramp up on hold due to restrictions on oil export route.
Teesside - CATS 1 01/09/2020  21:24:37 01/09/2020 1 day 2.8 Culzean export returning to normal.
Teesside - CATS 0 31/08/2020  21:24:37 01/09/2020 ~1 day 8.3 Reduced export from Culzean.
Teesside - CATS 2 31/08/2020  21:21:16 31/08/2020 1 day 7 Reduced export from Culzean.
Teesside - CATS 1 31/08/2020  16:54:42 31/08/2020 1 day 9.8 Reduced export from Culzean.
Teesside - CATS 0 31/08/2020  14:30:14 31/08/2020 ~1 day 5.5 Reduced export from Culzean.
Bacton SEAL 1 25/08/2020  16:22:17 25/08/2020 3 day 2 Reduction not as big as first thought.
Bacton SEAL 0 25/08/2020  11:32:22 25/08/2020 ~3 day 4.5 Elgin Franklin rates are being reduced it's expected to drop to around 5 MCM/D. Elgin Franklin gas at Bacton SEAL will reduce over the course of the gas day. FPS restrictions on the oil export route have reduced Elgin Franklin gas export rates. Restrictions are expected to remain in place until the FPS shutdown.
NSMP - SF 4 21/08/2020  09:55:21 21/08/2020 1 day 1.5 Laggan Tormore rates continue to ramp up. Normal rates expected for gas day 22.
NSMP - SF 3 21/08/2020  06:03:18 21/08/2020 1 day 5.2 Laggan Tormore export rates have stopped. Restarted overnight, stock being rebuilt.
NSMP - SF 2 20/08/2020  16:24:27 20/08/2020 1 day 7.2 Laggan Tormore export rates have stopped. Restart not expected until gas day the 21st.
NSMP - SF 1 19/08/2020  22:58:08 19/08/2020 2 day 7.2 Laggan Tormore export rates have stopped. Restart not expected until late on the 20th.
NSMP - SF 0 19/08/2020  10:02:53 19/08/2020 ~1 day 6.5 Laggan Tormore export rates have stopped. Restart time unknown at present.
Teesside - CATS 2 09/07/2020  19:52:18 09/07/2020 1 day 1.1 Culzean rates ramping up.
Teesside - CATS 1 09/07/2020  05:53:18 09/07/2020 1 day 4 Reduction in Culzean export levels.
Teesside - CATS 0 08/07/2020  22:31:48 08/07/2020 ~2 day 3.1 Reduction in Culzean export levels.
Teesside - CATS 10 19/06/2020  08:23:31 19/06/2020 1 day 1.4 Culzean rates remaining at close to normal levels at the moment.
Teesside - CATS 9 19/06/2020  05:55:29 19/06/2020 1 day 5.1 Culzean rates expected to reduce later today.
Teesside - CATS 8 18/06/2020  20:42:26 18/06/2020 2 day 0 Culzean increased to normal levels. Rates expected to reduce again on Friday.
Teesside - CATS 7 18/06/2020  13:48:50 18/06/2020 2 day 2.8 Culzean increase has been less than expected.. Rates expected to reduce again on Friday.
Teesside - CATS 6 18/06/2020  10:25:52 18/06/2020 2 day 0 Planned increase in rates from Culzean this morning. Rates expected to reduce again on Friday.
Teesside - CATS 5 18/06/2020  05:50:17 18/06/2020 2 day 6.9 Increase in export from Culzean.
Teesside - CATS 4 17/06/2020  17:19:36 17/06/2020 3 day 8.8 Increase in export from Culzean.
Teesside - CATS 3 17/06/2020  12:01:17 17/06/2020 3 day 10.9 Increase in export from Culzean.
Teesside - CATS 2 17/06/2020  05:43:00 17/06/2020 3 day 12.4 Further reduction in export from Culzean.
Teesside - CATS 1 16/06/2020  09:26:06 16/06/2020 4 day 10.6 Further reduction in export from Culzean.
Teesside - CATS 0 16/06/2020  06:07:50 16/06/2020 ~4 day 5.1 Reduction in export from Culzean.
Teesside - CATS 7 04/06/2020  06:02:19 04/06/2020 3 day 3.7 Culzean at reduced export rates.
Teesside - CATS 6 03/06/2020  06:33:48 03/06/2020 3 day 5.1 Culzean ramping up export rates.
Teesside - CATS 5 02/06/2020  21:20:39 02/06/2020 3 day 12 Culzean still at reduced export rates.
Teesside - CATS 4 02/06/2020  17:06:46 02/06/2020 2 day 12.8 Culzean has restarted, export rates expected to remain low for the rest of this gas day.
Teesside - CATS 3 02/06/2020  14:00:03 02/06/2020 2 day 14.3 Culzean has tripped, zero from 14:00 hrs onwards.
Teesside - CATS 2 02/06/2020  05:59:33 02/06/2020 2 day 8.7 Culzean has restarted but still at reduced export.
Teesside - CATS 1 01/06/2020  17:24:39 01/06/2020 1 day 9.9 Culzean has now tripped, restart is currently unknown. Flows will continue to drop further at CATS.
Teesside - CATS 0 01/06/2020  14:38:17 01/06/2020 ~1 day 4.4 Reduced export from Culzean.
Teesside - CATS 0 05/05/2020  17:52:06 05/05/2020 ~1 day 4.7 Reduced export from Culzean.
Teesside - CATS 0 02/05/2020  02:16:48 02/05/2020 ~1 day 4.6 Reduced export from Culzean.
Teesside - CATS 1 26/04/2020  09:03:55 26/04/2020 1 day 0 Culzean production back to normal levels.
Teesside - CATS 0 25/04/2020  14:34:48 25/04/2020 ~1 day 1.8 Reduced export from Culzean. Rates expected to drop further throughout the gas-day.
Teesside - CATS 2 23/04/2020  09:29:55 23/04/2020 2 day 1.5 Reduced export from Culzean.
Teesside - CATS 1 23/04/2020  05:51:03 23/04/2020 2 day 3.7 Reduced export from Culzean.
Teesside - CATS 0 22/04/2020  14:30:58 22/04/2020 ~2 day 7.4 Reduced export from Culzean.
Teesside - CATS 0 19/04/2020  10:24:38 19/04/2020 ~1 day 3.2 Reduced export from Culzean.
Teesside - CATS 1 04/04/2020  22:25:05 04/04/2020 1 day 3.1 Culzean returning to normal levels.
Teesside - CATS 0 04/04/2020  08:43:44 04/04/2020 ~1 day 6.2 Culzean tripped overnight. Production restarted and ramp up underway.
Teesside - CATS 4 07/03/2020  17:52:33 07/03/2020 3 day 7.4 Culzean production returning to normal levels by gas-day 8th March.
Teesside - CATS 3 07/03/2020  10:31:29 07/03/2020 3 day 7.4 Culzean production reduced offshore.
Teesside - CATS 2 07/03/2020  07:15:00 07/03/2020 3 day 8.7 Culzean production reduced offshore.
Teesside - CATS 1 06/03/2020  13:51:24 06/03/2020 3 day 11.5 Culzean production reduced offshore.
Teesside - CATS 0 04/03/2020  14:07:14 04/03/2020 ~2 day 11 Culzean production reduced offshore.
Bacton SEAL 3 26/02/2020  09:40:12 26/02/2020 1 day 3.5 Laggan Tormore has restarted and is ramping up, stock being rebuilt.
Bacton SEAL 2 26/02/2020  05:06:40 26/02/2020 1 day 6 Laggan Tormore has restarted and is ramping up, stock being rebuilt.
Bacton SEAL 1 25/02/2020  15:48:13 25/02/2020 1 day 5.3 Laggon Tormore shut down. Delay in restart.
Bacton SEAL 0 25/02/2020  11:25:05 25/02/2020 ~1 day 4.4 Laggon Tormore shut down.
Teesside - CATS 4 26/02/2020  09:40:12 26/02/2020 2 day 3.7 Culzean export rates almost back to normal.
Teesside - CATS 3 26/02/2020  05:06:40 26/02/2020 2 day 6.9 Culzean export rates almost back to normal. Line stock needs to be rebuilt.
Teesside - CATS 2 26/02/2020  08:00:06 26/02/2020 2 day 8.5 Culzean production reduced offshore.
Teesside - CATS 1 25/02/2020  16:57:10 25/02/2020 1 day 10.2 Culzean production reduced offshore.
Teesside - CATS 0 25/02/2020  11:19:03 25/02/2020 ~1 day 7.4 Culzean production reduced offshore.
Teesside - CATS 3 21/02/2020  05:08:18 21/02/2020 1 day 0.9 Culzean rebuilding stock account. Offshore rates back to normal.
Teesside - CATS 2 20/02/2020  21:00:48 20/02/2020 1 day 2.8 Culzean rebuilding stock account.
Teesside - CATS 1 20/02/2020  09:25:42 20/02/2020 1 day 7.6 Culzean trip overnight, Culzean has yet to restart.
Teesside - CATS 0 20/02/2020  05:20:37 20/02/2020 ~1 day 4.6 Culzean trip overnight, forecast to restart production during gas day 20-Feb-2020.
Bacton SEAL 1 03/02/2020  07:27:35 03/02/2020 ~1 day 0 Elgin Franklin gas export has restarted overnight. Flows at Bacton SEAL will commence from 08:00hrs onwards and ramp up over the rest of the gas-day.
Bacton SEAL 0 02/02/2020  16:46:13 02/02/2020 1 day 12 Elgin Franklin has tripped. Restart is currently unknown. Flows at Bacton SEAL will start to drop from 17:00hrs onwards.
Teesside - CATS 1 23/01/2020  10:20:48 23/01/20 ~4 days 3.4 Culzean to be exporting at reduced rates until the 27th.
Teesside - CATS 0 22/01/2020  13:17:03 22/01/20 4 days 4.6 Culzean to be exporting at reduced rates until the 27th.
Teesside - CATS 0 17/01/2020  14:03:35 17/01/20 2 days 10.1 Culzean is on reduced export rates until Sunday 19th January.
Teesside - CATS 3 17/01/2020  14:00:13 17/01/20 ~3 days 8.7 Culzean is on reduced export rates until Sunday 19th January.
Teesside - CATS 2 17/01/2020  10:20:59 17/01/20 ~3 days 7.4 Culzean is on reduced export rates until Sunday 19th January.
Teesside - CATS 1 16/01/2020  16:27:15 16/01/20 ~1 days 7.1 Culzean is on reduced export rates, investigations ongoing.Flows at CATS may reduce further later.
Teesside - CATS 0 16/01/2020  12:10:39 16/01/20 1 days 4.6 Culzean is on reduced export rates, investigations ongoing.
Teesside - CATS 4 12/01/2020  10:13:51 12/01/20 ~3 days 4 Flows at CATS returning to normal levels throughout the gas-day.
Teesside - CATS 3 11/01/2020  16:29:47 11/01/20 ~3 days 11.5 Culzean ramp-up is ongoing. Flows at CATS have commenced.
Teesside - CATS 2 11/01/2020  11:13:29 11/01/20 ~3 days 9.9 Culzean restart is under way followed by a slow ramp up over the rest of the gas-day. Flows at CATS may not commence until gas-day 12th January.
Teesside - CATS 1 10/01/2020  10:55:24 10/01/20 ~2 days 9.9 Culzean is still shutdown. Restart is unknown at this time. Nomination at CATS is currently being supplied from pipeline stock.
Teesside - CATS 0 09/01/2020  19:53:51 09/01/20 1 day 9.9 Culzean has tripped. Flows at CATS will continue to drop throughout the rest of the gas-day. Restart is not forecast until gas-day 10th January.
             

 

Historic Information

 

2019 Upstream operation information

 

2018 Upstream operational information

 

2017 Upstream operational information

 

2016 Upstream operational information

 

2015 Upstream operational information