Skip to content

TotalEnergies E&P UK Upstream Operational Information

As required under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT), this page provides information on the planned maintenance and unplanned unavailability of infrastructure operated by TotalEnergies E&P UK Limited.

Whilst every effort is made to ensure that the information is given in good faith and to the best of our knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of that information.

Notification of Planned Unavailability

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

NSMP SF 5 18/03/2024  23:04:41 16/03/2024 2 Days 1.9 Maintenance at Laggan Tormore expected to complete today 18th.
NSMP SF 4 13/03/2024  21:20:35 16/03/2024 5 Days 1.9 It's hoped to start the pigging on Friday or Saturday.
NSMP SF 3 12/03/2024  22:06:54 14/03/2024 5 Days 1.9 Laggan Tormore shutdown for pigging, Ramp up expected on 18th May with rates of approx 2.6 MCM/D from the 19th March. Start date is weather dependent.
NSMP SF 2 11/03/2024  22:05:40 13/03/2024 5 Days 1.9 Laggan Tormore shutdown for pigging, Ramp up expected on 17th May with rates of approx 2.6 MCM/D from the 18th March. Start date is weather dependent.
NSMP SF 1 10/03/2024  13:06:29 12/03/2024 5 Days 1.9 Laggan Tormore shutdown for pigging, Ramp up expected on 16th May with rates of approx 2.6 MCM/D from the 17th March. Start date is weather dependent.
NSMP SF 0 22/02/2024  14:58:53 17/03/2024 3 Days 2.7 Laggan Tormore shutdown for pigging, subject to weather.
NSMP SF 0 22/02/2024  14:49:21 10/05/2024 21 Days 2.5 Planned maintenance.
Teeside CATS 0 22/02/2024  14:33:14 07/06/2024 21 Days 10 Planned maintenance, there will be a ramp down prior to the start date. Restart dependent on third party maintenance being complete.
Backton SEAL 0 22/02/2024  14:11:57 03/07/2024 1 Day 5.5 Liquid export rout is unavailable due to planned maintenance, therefore no gas export from Elgin Franklin. Approximately 2.5 MCM/D of Elgin Franklin gas going to the Perenco terminal will stop at the same time. Ramp down/ ramp up timings TBC.
Backton SEAL 0 22/02/2024  08:34:50 01/08/2024 5 Days 5.5 Elgin Franklin flows at Bacton SEAL will be zero due to planned terminal maintenance. Approximately 2.5 MCM/D of Elgin Franklin gas going to the Perenco terminal will stop at the same time. Ramp up period following maintenance TBC.
             

Notification of Unplanned Unavailability

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Bacton SEAL 1 28/02/2024  19:41:23 29/02/2024 1 Day 0 Elgin Franklin gas export restarted quicker than anticipated therefore flows from SEAL will not cease and remain online.
Bacton SEAL 0 28/02/2024  18:35:05 29/02/2024 1 Day 5.4 Elgin Franklin gas export has stopped due to a trip, export expected to restart later tonight. Flows from Bacton SEAL will cease at 2100 hrs. In addition to the below approximately 2.4 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal.
Bacton SEAL 2 19/01/2024  13:06:49 19/01/2024 1 Day 3.0 Elgin Franklin delivery at Bacton SEAL forecast to restart from 1400 today.
Bacton SEAL 1 18/01/2024  21:34:43 19/01/2024 1 Day 6.0 Elgin Franklin restart process under way, gas export not expected until mid morning tomorrow.
Bacton SEAL 0 18/01/2024  05:56:30 19/01/2024 1 Day 6.0 Elgin Franklin gas export has stopped due to a trip, export expected to restart later today. Flows from Bacton SEAL will cease at 0600 hrs. In addition to the below approximately 2.4 MCM/D of Elgin gas was being delivered at the Bacton Perenco terminal.
             

Historic Information

2023 Upstream operational information

2022 Upstream operational information

2021 Upstream operational information

2020 Upstream operational information

2019 Upstream operational information

2018 Upstream operational information

2017 Upstream operational information

2016 Upstream operational information