As required under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT), this page provides information on the planned maintenance and unplanned unavailability of infrastructure operated by Total E&P UK Limited.

Whilst every effort is made to ensure that the information is given in good faith and to the best of our knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of that information.

Notification of Planned Unavailability

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

St Fergus114/11/16 09:5720/11/16 05:0028 days5.7Two days prior to the event flows will start to decrease. It will take two days after the event for flows to ramp back up to normal rates.   
St Fergus130/10/16 08:0030/10/16   Flows are ramping up, normal rates expected for gas day 31-Oct-2016
St Fergus028/10/16 20:1529/10/16 05:0024-36 hours5.0 
St Fergus024/10/16 20:5022/11/16 05:0026 days5.7Two days prior to the event flows will start to decrease. It will take two days after the event for flows to ramp back up to normal rates. 
Bacton SEAL 20/10/16 08:3020/10/1624 hours5 
St Fergus 06/10/16 19:42  7A further delay in increasing offshore flow.  Loss of 7.0 MCM.  At present it is unknown when flows will return to normal levels. 
St Fergus406/10/16 05:0506/10/16 7delay in increasing offshore flows, loss of around 7.0 MCM, normal production rates not expected until gas day 07-Oct-2016
St Fergus301/10/16 15:510210 - 05/10  Update of planned works in previous REMIT post at 2016-09-28 06:59:54   Offshore flow reductions resulting in reduced flows at NSMP St. Fergus   New dates below:   Gas Day 02-Oct-2016 ~ 4.0 MCM Gas Day 03-Oct-2016 loss increased by 10.0 MCM Gas Day 04-Oct-2016 expected loss reduced to 6.5 MCM Gas Day 05-Oct-2016 expected loss reduced to 5.0 MCM 
St Fergus228/09/16 06:5902/10 - 04/10  New dates below:   Gas Day 02-Oct-2016 3.0 MCM Gas Day 03-Oct-2016 loss increased by 11.0 MCM Gas Day 04-Oct-2016 expected loss reduced to 3.0 MCM 
St Fergus126/09/16 19:4329/09 -01/10  New dates below:   Gas Day 29-Sep-2016 3.0 MCM Gas Day 30-Sep-2016 loss increased by 11.0 MCM Gas Day 01-Oct-2016 expected loss reduced to 3.0 MCM 
St Fergus026/09/16 13:5227 - 29 September  Offshore flow reductions resulting in reduced flows at NSMP St. Fergus   Gas Day 27-Sep-2016  3.0 MCM, Gas Day 28-Sep-2016 loss increased by 11.0 MCM,Gas Day 29-Sep-2016 expected loss reduced to 3.0 MCM   
Bacton SEAL108/08/16 08:2808/08/16  Delay in restarting TOTAL E&P UK operated production, offshore production is forecast to restart this morning with delivery at Bacton SEAL a couple of hours later.   Ramp up of flows will take approximately 48 hours  
Bacton SEAL007/08/16 17:4307/08/16  Delay in restarting TOTAL E&P UK operated production, offshore production will not restart until gas day 08-Aug-16 ramp up of flows will take approximately 48 hours
St Fergus021/06/16 21:0022/06/16 05:007 days13-613-10 mcm/d reduction for 2 days and then 8-6 mcm/d reduction for 5 days.
Bacton SEAL219/05/16 08:0316/05/16  

SEAL flows now starting to increase, slow ramp up to previous rates over the next 24-48 hours

Bacton SEAL118/05/16 13:5616/05/16 9.0

Flow increase at SEAL not expected until Thursday (19/5) PM with a slow ramp up

Bacton SEAL016/05/16 12:1716/05/162 days9.0

flow loss of 9.0 MCM/D over the remainder of this gas day, duration expected to be 2 days

Bacton SEAL112/05/16 05:5011/05/16  

ramp up of offshore flows ongoing, Bacton SEAL flows to slowly increase over the course of the day

Bacton SEAL011/05/2016 05:5511/05/1624 hours5.0 
St Fergus113/04/16 20:4012/04/16 05:00 6.5

loss increased from 5.0 to 6.5 mcm/d from 2100 on the 13/04/2016. Duration until end of this gas day

St Fergus012/04/16 01:2712/04/16 05:002 days5 
Bacton SEAL510/03/16 14:1504/03/16  

Update, ramp up of flows at Bacton SEAL due to commence from 15:00hrs with normal rates by the end of the day..

Bacton SEAL410/03/16 11:2904/03/16  

Update: ramp up of flows at Bacton SEAL is unknown at present. Further update will follow once offshore flow has started

Bacton SEAL310/03/16 06:4704/03/16  Update: restart ongoing, ramp up of flows at Bacton SEAL now expected from midday today.
Bacton SEAL209/03/16 16:2404/03/16  Update: restart ongoing, ramp up of flows at Bacton SEAL now expected from 02:00hrs on the 10/03/16
Bacton SEAL109/03/16 11:2304/03/16  

Update: restart ongoing, ramp up of flows at Bacton SEAL expected from 20:00hrs tonight

Bacton SEAL002/03/16 11:4004/03/165 days9.0 
St Fergus417/02/16 15:2713/02/16 05:00  Update: offshore production resumed, rates increasing over the next 24 hours
St Fergus316/02/16 07:5013/02/16 05:00 5.0Update: unknown when offshore production will restart.  An update will be issued once production has restarted
St Fergus215/02/16 18:5513/02/16 05:00 5.0Update: no increase in rates for this gas day (15-Feb-2016)
St Fergus115/02/16 08:0513/02/16 05:00 5.0Update: rates expected to increase this afternoon
St Fergus012/02/16 21:0013/02/16 05:002 days5.0 
St Fergus021/10/15 09:1021/10/15 10:001 hour13 
St Fergus113/06/15 16:4514/6/201516 days6 
St Fergus030/04/2015 14:0015/06/201515 days7 
Bacton SEAL128/03/2015 09:1728/03/2015 09:15  Rates are slowly increasing
Bacton SEAL026/03/2015 06:5726/03/2015 07:0036 hours4.7Loss over the next ~6 hours
Bacton SEAL119/03/2015 21:5919/03/2015 22:00  Ramping up to normal levels over the next 24 hours
Bacton SEAL017/03/2015 11:0217/03/2015 11:002 - 3 days7.6Loss over the next 16 hours
St Fergus006/01/2015 20:0707/01/2015 06:006 hours12 
       

Notification of Unplanned Unavailability

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Bacton SEAL223/11/16 05:1222/11/16 11.5flows at BACTON SEAL expected to increase this morning with a slow ramp up over the following 24-36 hours   
Bacton SEAL122/11/16 12:0022/11/16 11.5

Flow reduction of 11.5 MCM/D, offshore flow increase not expected until late this evening wtih a slow ramp up over the following gas day

Bacton SEAL022/11/16 05:5022/11/16 11.5Flow reduction of 11.5 MCM/D over the next seven hours duration unknown at present
St Fergus104/11/16 05:0203/11/16 2loss reduced by 1.0 MCM, flows are ramping up to previous levels, normal levels expected by the start of gas day 05-Nov-2016 
St Fergus003/11/16 10:5303/11/16 11:00~12 hours3duration expected to be at least 12 hours
St Fergus131/10/16 16:0331/10/16 3flow loss reduced to 3.0 MCM, flows ramping up, normal flows expected for gas day 01-Nov-16
St Fergus031/10/16 09:3231/10/16 5normal flows expected for gas day 01-Nov-16 
Bacton SEAL010/02/16 12:0410/02/16 9.8Due to zero gas flow at Bacton SEAL offshore production has now been requested to stop, loss of 9.8 MCM, duration unknown
St Fergus015/09/16 15:1015/09/16 15:00 4Loss of 4 MCM/D, normal production expected for tomorrow
St Fergus115/09/16 13:2115/09/16 05:00 3.5

Flow reduced to approximately 3.5 MCM/D, ramping up to previous rates over remainder of the gas day

St Fergus015/09/16 04:4415/09/16 05:00 5.0Flow reduced by approximately 5.0 MCM/D, duration unknown
Bacton SEAL109/09/16 07:1009/06/16 07:00  ramp up ongoing, previous rates expected within 24-36 hours
Bacton SEAL008/09/16 22:1508/09/16 22:00 9.0Flow reduced by 9 MCM/D over the next ~8 hours, Duration unknown at the moment
Bacton SEAL206/09/16 19:5406/09/16 20:00 8.5flow loss reduced to 8.5 MCM , reason due to third party, duration – ramp up to previous rates expected to take 24-36 hours
Bacton SEAL105/09/16 19:2805/09/16 1010 MCM flow loss, reason due to third party, duration - no increase expected until during gas day 06/09/16
St Fergus105/09/16 10:4005/09/16 11:00 3Ramp up is on going
St Fergus005/09/16 05:0005/09/16 05:00 4.5loss expected due to reduce in the next 6 hours
Bacton SEAL004/09/16 23:0704/09/16 10approximately 10 MCM flow loss over the next 8 hours, reason due to third party, duration unknown at present
St Fergus131/08/16 10:3331/08/16 11:00 4.5flow slowly ramping up.
St Fergus031/08/16 05:0131/08/16 05:00 6.5unknown duration
Bacton SEAL721/08/16 13:1314/08/16  Offshore flows restarted, Delivery at Bacton SEAL forecast to increase from 1400 today (21/08/16), A slow ramp up to previous rates over the next 24-48 hours
Bacton SEAL620/08/16 07:3314/08/16 11flows are not forecast to increase at Bacton SEAL during  gas day 20-Aug-2016.  Current best estimate would be an increase during gas day 21-Aug-2016
Bacton SEAL519/08/16 23:4414/08/16  flows not expected to increase until around the start of gas day 20-Aug-2016, there will then be a slow ramp up over the following 24-48 hours
Bacton SEAL419/08/16 15:3914/0816  due to a problem on ramp up offshore flows have stopped.  Duration: flows are not currently forecast to increase again until midnight today
Bacton SEAL318/08/16 23:1714/08/16 11Flows are forecast to increase at Bacton SEAL around the start of gas day 19/08/16 with a ramp up to previous rates over the following 36-48 hours 
Bacton SEAL216/08/16 11:5114/08/16 11Flow reduced by 11 MCM/D, increase in offshore flows not expected until late Thursday 18th August
Bacton SEAL115/08/16 14:1814/08/16 11

Flow reduced by 11 MCM/D, increase in offshore flows not before Wednesday

Bacton SEAL014/08/16 22:5514/08/16  Flow reduced by 11 MCM/D over the next ~12 hours, Duration unknown at the moment
St Fergus4

09/08/16 05:00

09/08/16 05:00 5normal rates expected during gas day 09-Aug-2016
St Fergus308/08/16 20:1608/08/16 20:00 10.5flows increasing, normal rates expected for gas day 09-Aug-2016
St Fergus208/08/16 04:4808/08/16 05:00 12loss of 12 mcm, duration unknown
St Fergus107/08/16 17:5407/08/16 09:00 10no reduction in loss expected for gas day 07-Aug-2016. 
St Ferugs007/08/16 08:1107/08/16 09:00 10loss of 10 mcm, duration unknown
St Fergus415/07/16 18:3615/07/16 18:00 4.5loss reduced to 4.5 mcm/day.   Normal flow for gas day 16-Jul-2016
St Fergus315/07/16 09:9515/07/16 10:00 6.0ramp up ongoing - normal rates expected for tomorrow's gas day
St Fergus215/07/16 07:3715/07/16 08:00 8.0flow loss will reduce over gas day 15/07/2016 as offshore production continues to ramp up
St Fergus115/07/16 04:2815/07/16 05:00 11.0flow loss will reduce over gas day 15/07/2016 as offshore production continues to ramp up slowly
St Fergus014/07/16 21:4614/07/16 21:00unknown5.0 
St Fergus126/06/16 12:0026/06/16 05:00  production restarted, flows returning to previous levels throughout the day
St Fergus026/06/16 04:3026/06/16 05:00unknown7.0~7 mcm/d loss, duration unknown
Bacton SEAL020/06/16 07:2519/06/16 7.0flow loss of 7.0 MCM/D overnight, production now restarted: flows expected to increase throughout the day
Bacton SEAL213/06/16 07:23

12/06/16

  offshore flows restarted, Bacton SEAL flows forecast to increase from 0800 13/06/2016 with ramp up to previous levels over the course of the day
Bacton SEAL112/06/16 23:1312/06/16  flows not expected to increase until the start of gas day 13/06/2016
Bacton SEAL012/06/16 19:5012/06/16  

flow loss of 9.0 MCM/D over the next few hours, duration: flows expected to increase from 0200 13/06/16

Bacton SEAL025/05/16 20:3025/05/16 20:00  

flow loss of 9.0 MCM/D over the next 6 hours, duration: flows expected to increase at start of gas day 26/05/16

St Fergus121/05/16 10:3521/05/16 05:00 5.0

loss reduced to 5.0 mcm - ramp up of flows continues

St Fergus021/05/16 03:4621/05/16 05:00unknown10 
St Fergus109/05/16 12:3509/05/16 10:00 7loss of 5 mcm increased by a further 2 mcm from 1300 09/05/16, no expected increase for this gas day
St Fergus009/05/16 10:0009/05/16 10:00 5initial loss of 5 mcm, loss likely to increase, duration unknown
St Fergus106/05/16 06:1805/05/16 16:00 12restart ongoing, ramp up over the next 24 hours
St Fergus005/05/16 15:2005/05/16 16:00 5.0duration unknown
St Fergus418/04/16 12:5115/04/16 01:00 7.4

increase in flows planned for tonight with a gradual ramp up to prevous rates during gas day 19th April

St Fergus317/04/16 22:3015/04/16 01:00 7.4

increase in flows delayed until tomorrow morning (18/4/2016) with a gradual ramp up to previous rates

St Fergus217/04/16 12:2215/04/16 01:00 7.4increase in flows expected late tonight with a gradual ramp up to prevous rates during gas day 19th April
St Fergus115/04/16 12:0515/04/16 01:002 days7.4 
St Fergus015/04/16 00:5115/04/16 01:00unknown6.0Impact on gas day  15/04/2016 starting 0500 of 7.4 MCM/D
Bacton SEAL012/04/16 15:3212/04/168 hours9

flow loss of 9.0 MCM over the next 8 hours, increase in flows not expected before midnight

St Fergus031/03/16 20:4531/03/16 20:009 hours5 
St Fergus016/03/16 09:5116/03/16 05:0024-36 hours5 
Bacton SEAL321/02/16 22:2720/02/16 15:20  Offshore flows have restarted   Flow increase at Bacton SEAL forecast from 22/02/16 0200  
Bacton SEAL221/02/16 11:5120/02/16 15:20 9Restart of offshore flow not expected before 1800 21/02/2016 with Bacton flow increase forecast from 2200 21/02/2016 
Bacton SEAL120/02/16 22:5920/02/16 15:20 9.0

 Restart of offshore flow expected around midday 21/02/2016 then an increase in Bacton flows a few hours later

Bacton SEAL020/02/16 15:3220/02/16 15:208 hours7.0 
Bacton SEAL113/02/16 08:2012/02/16 3.5expecting to return to normal offshore export rates later today
Bacton SEAL012/02/16 08:5712/02/16unknown5.0due to third party, duration currently unknown
Bacton SEAL218/11/15 090016/11/15  increase in flows not expected for another 6-9 hours
Bacton SEAL117/11/15 15:0016/11/15  increase in flows not expected for another 12-18 hours
Bacton SEAL016/11/15 15:2516/11/15unknown9approx 9 mcm/d loss over the next ~ 8 hours, duration currently unknown.
Bacton SEAL323/09/15 12:0022/09/15 9Flow increase has been delayed, an increase in flows at Bacton SEAL is not expected now until ~2200 on the 23/9 with a slow ramp up to previous rates.
Bacton SEAL223/09/15 07:0322/09/15 9Flow increase has been delayed, an increase in flows at Bacton SEAL is not expected now until ~1300 on the 23/9 with a slow ramp up to previous rates
Bacton SEAL122/09/15 19:5822/09/156 hours9Flows are expected to drop by ~9 mcm/d in the next ~6 hours with rates returning to normal from 01:00 hrs.
Bacton SEAL022/09/15 18:5522/09/156 hours9Flows are expected to drop to zero in the next ~6 hours with rates returning to normal from 01:00 hrs.
Bacton SEAL610/09/15 22:2005/09/15  Update - offshore production has restarted.  Flows at Bacton SEAL are expected to increase from 0200 on the 11th September
Bacton SEAL509/09/15 19:1505/09/1524-36 hours9.5Update -offshore production expected to restart in 24-36 hours with a slow ramp up.  Flows at Bacton SEAL are expected to increase during this period
Bacton SEAL4

07/09/15 12:30

05/09/15~2 more days9.5Update - no increase in Bacton SEAL flows expected before Wednesday 09 September
Bacton SEAL306/09/2015 14:2805/09/15unknown9.5Update - it’s not currently known when a restart of offshore production will happen and then an increase in flows at Bacton SEAL
Bacton SEAL206/09/2015 08:3405/09/15 9.5Update - delivery at Bacton SEAL forecast to increase from 1400 following offshore restart planned for 11am
Bacton SEAL105/09/2015 22:5105/09/2015unknown9.5Update - Offshore restart delayed, no restart planned for this gas day, a further update will be provided tomorrow
Bacton SEAL005/09/2015 13:5405/09/2015~10 Hours9.5

approx 9.5 mcm/d loss over the next 8 hours.

Offshore restart forecast from 2200 tonight with ramp up of flows at Bacton SEAL forecast to start from 0100

Bacton SEAL125/07/2015 13:5025/07/2015  Rates returned to normal from 13:00hrs
Bacton SEAL0

25/07/2015 08:54

25/07/2015~7 hours5 
Bacton107/05/2015 09:1207/05/2015  

Ramp up ongoing, normal rates expected within 24 hours

Bacton006/05/2015 16:5106/05/2015~9 hours7.8 
Bacton023/02/2015 05:3623/02/2015 06:00Unknown~5 
       

Click here for historical REMIT information for Total E&P UK.