As required under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT), this page provides information on the planned maintenance and unplanned unavailability of infrastructure operated by Total E&P UK Limited.

Whilst every effort is made to ensure that the information is given in good faith and to the best of our knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of that information.

Notification of Planned Unavailability

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Bacton SEAL919/09/17 14:2930/07/17 18:0053 days11.0

Offshore production has restarted and ramp-up is in progress. A 2 day ramp up to normal rates within 48 hours.

Bacton SEAL818/09/17 15:2730/07/17 18:0052 days11.0

Start-up is in progress. A 2 day ramp up to normal rates is expected to commence from the 19th September 2017

Bacton SEAL717/09/17 17:2930/07/17 18:0051 days11.0

Due to delay estimated restart is now 18th September 2017.

Bacton SEAL614/09/17 15:1530/07/17 18:0050 days11.0

Due to delay estimated restart is now 17th September 2017.

Bacton SEAL513/09/17 15:5030/07/17 18:0048 days11.0

Due to delay estimated restart is now 15th September 2017.

Bacton SEAL408/09/17 16:3830/07/17 18:0047 days11.0Due to delay estimated restart is now 14th September 2017.
Bacton SEAL325/08/17 12:0430/07/17 18:0045 days11.0

Due to delay estimated restart is now 12th September 2017.

Bacton SEAL218/08/17 16:0830/07/17 18:0039 days11.0

Due to delay estimated restart is now 6th September 2017.

Bacton SEAL130/07/17 08:5430/07/17 18:0027 days11.0Offshore production has stopped earlier than forecast.    A 2 day ramp up to normal rates is forecast to commence on the 25th August 2017

 

Bacton SEAL030/06/17 15:1231/07/17 06:0027 days11.5

Ramp down of flows commencing 30th July 2017

2 day ramp up to normal rates will commence on the 26th August 2017

 

St Fergus225/06/17 08:4727/06/17 18:00~ 48 hours3ramp up ongoing, normal rates not expected for another 48 hours.
St Fergus124/06/2017 08:5224/06/17 ~6Offshore ramp is expected from midday, ramp up to normal rates not expected until Monday the 26th.
St Fergus028/04/17 12:2117/06/17 05:007 days9.0 
St Fergus016/04/17 16:3519/04/17 05:0024 hours8.5Rates will increase during gas day 20-Apr-2017 and rates will be normal again for gas day 21-Apr-2017
Bacton SEAL2

08/04/17 23:55

08/04/17 06:00 9.5

Due to a minor issue with the tide/weather situation, offshore flows ramp up is delayed to gas day 09/04/17.

Bacton SEAL107/04/17 15:4508/04/17 06:00 6

Offshore flows are currently reducing but Impact on gas day 07/04/17 is minimal. Offshore flows are forecasted to recommence during gas day 08/04/17.

Bacton SEAL403/04/17 18:0002/04/17 03:00 6Gas export has commenced from Elgin Franklin with slow ramp up as per procedures.
Bacton SEAL302/04/17 22:0702/04/17 03:00 11Ramp up delayed, duration unknown
Bacton SEAL202/04/17 18:2002/04/17 03:0020 hours8.5Ramp up delayed to 23:00 pm this evening.
Bacton SEAL102/04/17 10:1902/04/17 03:0014 hours6Flows currently at 0 mcm/day. Ramp up expected around 5 pm this afternoon.
Bacton SEAL329/03/17 07:4026/03/17  production restarted overnight. Flows at Bacton SEAL forecast to increase from 29-Mar-17 08:00, ramp up to previous rates over the next 2 days
Bacton SEAL228/03/17 08:4326/03/17unknown12Third party works complete. Start up tests ongoing, unknown at present when gas export will restart.
Bacton SEAL125/03/17 18:0226/03/1736-48 hours12.0

Offshore production ramp down on gas day 26th March. Offshore production is planned to stop for 36-48 hours A 2 day ramp up to previous rates is expected once the works are complete

Planned offshore reduction at Elgin Franklin (Bacton SEAL). The flow reduction is due to works being carried out by a third party on the oil export route. The duration and timing are subject to change.

Bacton SEAL019/03/17 09:0626/03/1736 hours12.6Offshore production ramp down on gas day 25th March. Offshore production is planned to stop for 36 hours starting 26th March. A 2 day ramp up to previous rates is expected once the works are complete
St Fergus208/02/17 06:5908/02/17 4Issue starting compressor delaying ramp up. Forecast to start compressor this morning with a ramp up to normal rates for gas day 09-Feb-2017
St Fergus107/02/17 07:2407/02/17 6Issue starting compressor delaying ramp up. Forecast to start compressor this morning with a ramp up to normal rates for gas day 08-Feb-2017
St Fergus003/02/17 11:4306/02/17 05:0012-18 hours11

11 mcm/day Flow loss estimated for 12-18 hours. Normal rates expected for gas day 07/02/17.

St Fergus218/12/16 12:0020/11/16 5.7

Ramp up ongoing, normal flows expected within 24-36 hours   

Bacton SEAL117/12/16 11:4014/12/16 4-5ramp up of flows expected over the next 24-48 hours 
Bacton SEAL012/12/16 07:3414/12/162-3 days5 
St Fergus114/11/16 09:5720/11/16 05:0028 days5.7Two days prior to the event flows will start to decrease. It will take two days after the event for flows to ramp back up to normal rates.   
St Fergus130/10/16 08:0030/10/16   Flows are ramping up, normal rates expected for gas day 31-Oct-2016
St Fergus028/10/16 20:1529/10/16 05:0024-36 hours5.0 
St Fergus024/10/16 20:5022/11/16 05:0026 days5.7Two days prior to the event flows will start to decrease. It will take two days after the event for flows to ramp back up to normal rates. 
Bacton SEAL 20/10/16 08:3020/10/1624 hours5 
St Fergus 06/10/16 19:42  7A further delay in increasing offshore flow.  Loss of 7.0 MCM.  At present it is unknown when flows will return to normal levels. 
St Fergus406/10/16 05:0506/10/16 7delay in increasing offshore flows, loss of around 7.0 MCM, normal production rates not expected until gas day 07-Oct-2016
St Fergus301/10/16 15:510210 - 05/10  Update of planned works in previous REMIT post at 2016-09-28 06:59:54   Offshore flow reductions resulting in reduced flows at NSMP St. Fergus   New dates below:   Gas Day 02-Oct-2016 ~ 4.0 MCM Gas Day 03-Oct-2016 loss increased by 10.0 MCM Gas Day 04-Oct-2016 expected loss reduced to 6.5 MCM Gas Day 05-Oct-2016 expected loss reduced to 5.0 MCM 
St Fergus228/09/16 06:5902/10 - 04/10  New dates below:   Gas Day 02-Oct-2016 3.0 MCM Gas Day 03-Oct-2016 loss increased by 11.0 MCM Gas Day 04-Oct-2016 expected loss reduced to 3.0 MCM 
St Fergus126/09/16 19:4329/09 -01/10  New dates below:   Gas Day 29-Sep-2016 3.0 MCM Gas Day 30-Sep-2016 loss increased by 11.0 MCM Gas Day 01-Oct-2016 expected loss reduced to 3.0 MCM 
St Fergus026/09/16 13:5227 - 29 September  Offshore flow reductions resulting in reduced flows at NSMP St. Fergus   Gas Day 27-Sep-2016  3.0 MCM, Gas Day 28-Sep-2016 loss increased by 11.0 MCM,Gas Day 29-Sep-2016 expected loss reduced to 3.0 MCM   
Bacton SEAL108/08/16 08:2808/08/16  Delay in restarting TOTAL E&P UK operated production, offshore production is forecast to restart this morning with delivery at Bacton SEAL a couple of hours later.   Ramp up of flows will take approximately 48 hours  
Bacton SEAL007/08/16 17:4307/08/16  Delay in restarting TOTAL E&P UK operated production, offshore production will not restart until gas day 08-Aug-16 ramp up of flows will take approximately 48 hours
St Fergus021/06/16 21:0022/06/16 05:007 days13-613-10 mcm/d reduction for 2 days and then 8-6 mcm/d reduction for 5 days.
Bacton SEAL219/05/16 08:0316/05/16  

SEAL flows now starting to increase, slow ramp up to previous rates over the next 24-48 hours

Bacton SEAL118/05/16 13:5616/05/16 9.0

Flow increase at SEAL not expected until Thursday (19/5) PM with a slow ramp up

Bacton SEAL016/05/16 12:1716/05/162 days9.0

flow loss of 9.0 MCM/D over the remainder of this gas day, duration expected to be 2 days

Bacton SEAL112/05/16 05:5011/05/16  

ramp up of offshore flows ongoing, Bacton SEAL flows to slowly increase over the course of the day

Bacton SEAL011/05/2016 05:5511/05/1624 hours5.0 
St Fergus113/04/16 20:4012/04/16 05:00 6.5

loss increased from 5.0 to 6.5 mcm/d from 2100 on the 13/04/2016. Duration until end of this gas day

St Fergus012/04/16 01:2712/04/16 05:002 days5 
Bacton SEAL510/03/16 14:1504/03/16  

Update, ramp up of flows at Bacton SEAL due to commence from 15:00hrs with normal rates by the end of the day..

Bacton SEAL410/03/16 11:2904/03/16  

Update: ramp up of flows at Bacton SEAL is unknown at present. Further update will follow once offshore flow has started

Bacton SEAL310/03/16 06:4704/03/16  Update: restart ongoing, ramp up of flows at Bacton SEAL now expected from midday today.
Bacton SEAL209/03/16 16:2404/03/16  Update: restart ongoing, ramp up of flows at Bacton SEAL now expected from 02:00hrs on the 10/03/16
Bacton SEAL109/03/16 11:2304/03/16  

Update: restart ongoing, ramp up of flows at Bacton SEAL expected from 20:00hrs tonight

Bacton SEAL002/03/16 11:4004/03/165 days9.0 
St Fergus417/02/16 15:2713/02/16 05:00  Update: offshore production resumed, rates increasing over the next 24 hours
St Fergus316/02/16 07:5013/02/16 05:00 5.0Update: unknown when offshore production will restart.  An update will be issued once production has restarted
St Fergus215/02/16 18:5513/02/16 05:00 5.0Update: no increase in rates for this gas day (15-Feb-2016)
St Fergus115/02/16 08:0513/02/16 05:00 5.0Update: rates expected to increase this afternoon
St Fergus012/02/16 21:0013/02/16 05:002 days5.0 
St Fergus021/10/15 09:1021/10/15 10:001 hour13 
St Fergus113/06/15 16:4514/6/201516 days6 
St Fergus030/04/2015 14:0015/06/201515 days7 
Bacton SEAL128/03/2015 09:1728/03/2015 09:15  Rates are slowly increasing
Bacton SEAL026/03/2015 06:5726/03/2015 07:0036 hours4.7Loss over the next ~6 hours
Bacton SEAL119/03/2015 21:5919/03/2015 22:00  Ramping up to normal levels over the next 24 hours
Bacton SEAL017/03/2015 11:0217/03/2015 11:002 - 3 days7.6Loss over the next 16 hours
St Fergus006/01/2015 20:0707/01/2015 06:006 hours12 
       

Notification of Unplanned Unavailability

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

Bacton SEAL111/12/17 17:2912/12/17n/a10Elgin Franklin gas export has had to stop due to the shutdown of the oil export pipeline. The duration of the shutdown is not known at present. Elgin Franklin flows at Bacton SEAL will stop from 2100 today. 
Bacton SEAL011/12/17 06:3211/12/17 6

Due to a restriction on the oil export route for Elgin Franklin, gas export from the field has been reduced by approx 60% from normal levels. The duration is unknown at the moment.

Bacton SEAL07/12/17 09:5607/12/17 4Due to a restriction on the oil export route for Elgin Franklin, gas export from the field has been reduced by 60% from normal levels. The duration is unknown at the moment. The impact is uncertain at the moment also.
Bacton SEAL426/11/17 20:41  4.9Normal rates expected during gas day 27-Nov-2017. Elgin Frankin flow rate at Bacton SEAL forecast to be 5.5 MCM/Day at 2100 and will slowly increase to end of this gas day.
Bacton SEAL326/11/17 09:4126/11/17 6.4Elgin Frankin restart is ongoing. Current forecast is that flows will increase at Bacton SEAL from 1500 on gas day 26th November. There will be a slow ramp up from 1500.
Bacton SEAL226/11/17 01:3726/11/17 10.4An update will be sent once this occurs. This message only relates to Elgin Franklin, not all flow at Bacton SEAL. 
Bacton SEAL125/11/17 23:05  3.0Update: The flows at Bacton SEAL will continue to reduce during the night as the gas landed for Elgin Franklin at Bacton SEAL is only coming from pipeline stock. This message only relates to Elgin Franklin, not all flow at Bacton SEAL. As an end of day value the loss at Bacton SEAL is approximately 3.5 MCM. The original flowrate for today was 10.4 MCM, currently it's around 7 MCM/Day and by 0500 it's forecast to be only 1 MCM/D . A new message for gas day 26-Nov-2017 will be posted later.
Bacton SEAL025/11/17 18:2225/11/17 3.0Investigation ongoing. Initial estimate will be offshore production restarting 0600 26/11/17. There will be a ramp up period for offshore and then an increase in flows at the Bacton SEAL terminal. A further message will be posted when more is known
Bacton SEAL426/10/17 05:1026/10/173-4 days3.2Offshore flows are forecast to remain at 7.5 MCM/D into the weekend when they will increase to technical capacity
Bacton SEAL325/10/17 19:5025/10/17 7.7Flows at Bacton SEAL to slowly increase from 2000 (Gas day 25-Oct-2017)
Bacton SEAL225/10/17 05:1425/10/17 10.7The plant is being prepared for restart. Offshore gas export is not expected until late afternoon, with a slow increase in flows at Bacton SEAL from this evening. Forecast below assumes worst case of no restart today, an update will be sent when platform restarts
Bacton SEAL124/10/17 05:1224/10/17 10.7Restart time unknown
Bacton SEAL023/10/17 19:3323/10/17 5Offshore production has stopped, cause currently being investigated.
St Fergus307/9/17 11:27

06/09/17

 4.6

Ramp up will continue over gas day 07-Sep-2017.  Normal rates expected for gas day 08-Sep-2017

St Fergus207/0917 05:0706/09/17 6.7Offshore flows have restarted.   Ramp up will continue over gas day 07-Sep-2017.  Normal rates expected for gas day 08-Sep-2017
St Fergus106/09/17 14:4406/09/17 12:00 7.4Impact on within day increased.
St Fergus006/09/17 11:5206/09/17 12:00 5.7Currently in process of restarting offshore flows. Normal rates expected for gas day 07-Sep-2017
St Fergus316/07/17 20:2015/07/17 11:00 0Production now back at full rates.
St Fergus216/07/17 06:5415/07/17 11:00unknown9Restart commenced gas-day 16th July, ramp up to full rates over the next 12 hours.
St Fergus115/07/17 21:3515/07/17 11:00unknown9Restart is not currently forecast until end of gas-day 15th July/start of gas-day 16th July.
St Fergus015/07/17 12:1215/07/17 11:00unknown9Duration currently unknown.
Bacton SEAL216/06/17 15:2114/06/17 08:00 2.0Maintenance works completed earlier than planned. Offshore rates ramping up to previous levels over the next four hours
Bacton SEAL115/06/17 07:5914/06/17 08:00~ 7 days4.5estimated at 7 days
Bacton SEAL014/06/17 08:2314/06/17 08:00~2 days5.0Duration unknown at present estimated at 2 days
Bacton SEAL408/03/17 12:2806/03/17 14:55 2

Ramp up ongoing. Normal Flow rates expected before the end of gas day 08/03/17.

Bacton SEAL307/03/17 17:4406/03/17 14:55 5

Ramp up delayed until midday tomorrow (gas day 08/03/17).

St Fergus207/03/17 17:26 07/01/17 01:00 4

Ramp up ongoing. Normal rated expected for gas day 08/03/17.

Bacton SEAL207/03/17 09:2306/03/17 14:55 4

Flows ramping up. Normal rates expected for gas day 08/03/17.

St Fergus107/03/17 06:5707/01/17 01:00 5

Unplanned Offshore Flow Reduction at NSMP St Fergus Terminal (Greater Laggan Tormore). Duration unknown.

Bacton SEAL106/03/17 16:3606/03/17 14:55 5

Unplanned Offshore flow reduction at Bacton SEAL terminal (Elgin Franklin). Flow loss of 9 mcm/day other the next 12 hours. Duration unknown.

St Fergus206/03/17 15:5106/03/17 01:00 4

Ramp up ongoing. Flows are increasing and normal rates are expected from gas day 07/03/17.

St Fergus106/03/17 07:1506/03/17 01:00 5

Unplanned Offshore flow reduction at NSMP St Fergus Terminal (Greater Laggan Tormore). Duration Unknown

St Fergus219/02/17 09:5114/02/17 16:00 0

Flows ramped up as planned.

St Fergus115/02/17 07:4514/02/17 16:00 6

Flow reduction of 6 mcm/day. Ramp up ongoing, flows should be back to normal before the end of gas day.

St Fergus3

12/02/17 11:56

11/02/17 15:00 7

Ramp up to full production ongoing

St Fergus212/02/17 06:5611/02/17 15:00 11

Flow reduction of 11.0 MCM/D over the remainder of the gas day, duration unknown

St Fergus111/02/17 17:4811/02/17 15:00 4.5Duration unknown
Bacton SEAL804/02/17 10:4630/01/17 08:00 0

Flows at Bacton SEAL back to normal.

Bacton SEAL703/02/17 15:5130/01/17 08:00 3

Offshore production ramping up. Flows at Bacton SEAL to slowly increase over the course of this gas day.

Bacton SEAL630/01/17 06:5130/01/17 08:00 5Offshore production has tripped. On restart production will be limited to 5 MCM for unknown period 
Bacton SEAL519/01/17 11:4413/01/17 18:30 4.5

Ramp up on hold, duration unknown. Update will be sent once production increases.

Bacton SEAL417/01/17 09:36 13/01/17 18:30 6Ramp up on hold. Export rate is around 6 mscm/d and will remain at this value for at least 2 days..
Bacton SEAL316/01/17 10:4613/01/17 18:30 6